Azalea Hyper Retail Mall
A 45-kanal retail site in CBD Punjab, Lahore, offered through a joint-venture partnership — the largest single retail site in the programme. Its bid deadline passed in October 2026 with no award announced.
Hero art is illustrative only — it is not a photograph of this project.
Overview
Azalea is presented as “Lahore’s Next Hyper Retail Landmark” — a hyper retail mall site of 45 kanals, about 202,500 square feet, offered by the Punjab Central Business District Development Authority (PCBDDA) through a joint-venture procurement under the DBFOM model: Design, Build, Finance, Own, Operate and Maintain.
At 45 kanals it is the largest single retail site in the CBD Punjab programme — more than ten times the size of a single RetailX or Corporate Bay plot — and a hyper retail mall is a different kind of asset from a retail tower plot: one large destination rather than a building on a small site. The joint-venture model is the other half of the story. The site is not sold at auction or on fixed terms; the authority is looking for a partner to design, build, finance and operate the mall with it.
Location
The published record does not state the site’s district or precise position within CBD Punjab. That gap is stated plainly here rather than filled with a guess.
The floor area ratio of 1:2.5 is far lower than RetailX (1:7) or Corporate Bay (1:8). A low ratio on a large site points to a spread-out, low-rise development with parking and open areas, which fits a hyper retail mall. Access arrangements, neighbouring projects and the site’s position relative to Route 47, the lakefront or the boulevard have not been published. For a project of this size that is a material omission — a mall’s value depends on its catchment and its roads — and readers should ask PCBDDA for the site’s location and access plan before treating any third-party description as fact.
What is known
- Site: 45 kanals (about 202,500 square feet), floor area ratio 1:2.5.
- Model: DBFOM joint venture with PCBDDA — the partner designs, builds, finances, owns, operates and maintains the mall under an arrangement with the authority.
- Procurement: re-opened effective 28 September 2026 (briefing), with a bid submission deadline of 12 October 2026.
- Outcome: no award had been announced as of 13 October 2026, and no deadline extension, bid result, award or joint-venture partner announcement was found as of 12 November 2026.
- Reported terms: RFP fee PKR 50,000 (non-refundable) and bid security PKR 50 million — from a single third-party source; verify against the official tender notice.
Status
Procurement outcome unknown. The round was re-opened in September 2026, which suggests an earlier round did not conclude, and the October deadline passed with no published outcome a full month later. That is a warning sign, though not proof of failure: the terms may need to change, or the process may simply be slow.
No project cost or construction timeline exists yet — neither can exist until a partner is chosen.
What is not yet confirmed
- The site’s district and precise position within CBD Punjab.
- Whether the October 2026 deadline was extended, and whether any bids were received at all.
- The joint-venture partner’s identity.
- Project cost and construction timeline.
- The RFP fee and bid security figures, which come from a single third-party source and have not been verified against the official tender notice.
Facts on this page come from published reports and the official PCBDDA offering pages, rewritten here in PlottoSky’s own wording. Figures are dated October–November 2026; verify current details with PCBDDA before making any decision.