CBD Lake
A rainwater-harvesting lake of about 20 kanals along Route 47 in Quaid District — the one development in CBD Punjab whose purpose is water, not buildings.
Hero art is illustrative only — it is not a photograph of this project.
Overview
CBD Lake is an artificial lake at the centre of the CBD Walk waterfront proposition in Gulberg, Lahore. Built to collect rainwater and recharge groundwater, it was publicly unveiled around mid-2025.
Lahore’s monsoon flooding is a familiar problem, and the Walton Road area lived with it for decades. Drainage from Walton Road now directs into the lake, and press reporting credits that change with ending more than 30 years of rainwater ponding. The lake matters to residents and commuters around Walton Road and Gulberg, to the retail businesses of CBD Walk — for whom the lake is the waterfront that makes the corridor attractive — and to the district as visible proof of its sustainability claims.
Location
CBD Lake sits along CBD Route 47 in Quaid District, beside CBD Walk, on the former Walton Airport land in the Gulberg and Walton area. Route 47 is the 4.2 km link between the Quaid and Bab districts and Walton Road, built with Blue Road technology and completed in April 2025, so the lake is reached from Walton Road via Route 47.
It is part of the Route 47 green development, which also includes a solar flyover and cycling lanes. Its neighbours define its character: CBD Walk, the retail and dining corridor, wraps around it, and the Quaid District commercial core is a short distance away.
No published public access point, opening hours or visitor facilities could be verified for the lake itself, so it should be treated as a district landscape feature rather than a ticketed attraction unless PCBDDA says otherwise. CBD Lake is public infrastructure, not a product for sale: there are no plots, units or tickets attached to it.
What is known
- Size: about 20 kanals, around 20–25 feet deep, with a reported capacity of about five million gallons. The depth figure differs between sources (20 ft versus 25 ft).
- Purpose: rainwater collection and groundwater recharge.
- Drainage: Walton Road drainage now directs into the lake, reported as ending 30-plus years of rainwater ponding.
- Setting: part of the Route 47 green development — solar flyover and cycling lanes.
- Unveiled: around mid-2025.
Status
Upgrade works were ongoing as of October 2026 — marble slopes, rainwater wells and decorative fountains. On 4 October 2026 the PCBDDA chief executive visited CBD Lake and CBD Walk and directed works to be expedited to make the lake “fully operational”. The phrase implies the lake was not yet fully operational in October 2026: it exists and holds water, but the finished state was still being worked towards. A November 2026 report added that workers were installing marble across the lake’s base and slopes, and that the upgraded lake will feature modern high-tech fountains designed to improve water aeration and enhance its visual appeal.
No completion or operational date has been confirmed.
What is not yet confirmed
- The operational or completion date.
- The depth figure — 20 ft versus 25 ft between sources.
- The five-million-gallon capacity, a reported figure rather than one checked against an official engineering document.
- The drainage benefit, which is press-reported rather than a measured figure.
- Public access arrangements, opening hours or visitor facilities.
Facts on this page come from published reports and the official PCBDDA offering pages, rewritten here in PlottoSky’s own wording. Figures are dated October–November 2026; verify current details with PCBDDA before making any decision.