CBD Walk
The retail front of CBD Punjab — a premium commercial corridor beside CBD Lake in Quaid District, where the district stops being plots and towers and becomes somewhere to go.
Hero art is illustrative only — it is not a photograph of this project.
Overview
CBD Walk is PCBDDA’s premium commercial development beside CBD Lake in Quaid District, positioned as a retail and dining destination and the flagship development’s retail front component. Units were allocated through a transparent digital balloting process.
It matters to brands and restaurant operators looking for a lakeside address, to the owners of the 4-marla commercial units allocated by balloting, and to the wider district — a busy Walk makes surrounding offices, residences and plots more valuable.
Location
CBD Walk sits beside CBD Lake in Quaid District, on the former Walton Airport land in the Gulberg and Walton area, along CBD Route 47. Route 47 is the 4.2 km link to Walton Road built with Blue Road technology and completed in April 2025, so the Walk is reached from Walton Road via Route 47.
Its neighbours define it: the lake is its waterfront, and the Quaid District commercial core — including the SIRIUS tower plot on CBD Punjab Boulevard — is a short distance away. The units are 4-marla commercial units in a Shell & Core model, with lake-facing and park-facing positions. A “Second Walk” phase is under development at excavation stage, near the Walk and the lake, though its details are unverified. Published parking arrangements, opening hours and a public access plan for the Walk itself could not be verified.
What is known
- Concept: premium commercial units beside the lake as a retail and dining destination.
- Balloting: digital balloting ceremony on 23 July 2025, overseen by chief operating officer Brigadier (retired) Mansoor Janjua.
- Phase 2 auction: October 2025, reported at Rs 2.3 billion.
- Construction launch: reported 6 December 2025.
- Unit format: 4-marla units, Shell & Core model — the buyer or lessee receives the structure and fits it out — with lake-facing and park-facing positions.
- Leasing model: units are expected to be leased to brands, restaurants and food outlets by PCBDDA rather than sold outright as shops.
Status
Grey structures are complete and finishing works are in progress. In October 2026, elevation and road works were under way; a November 2026 report added that elevation work on all 32 commercial units had been completed, with travertine stone and glass installed across the buildings’ exterior elevations, and that the first petrol station along Route 47, near CBD Walk, had become operational. The chief executive visited CBD Lake and CBD Walk on 4 October 2026.
No handover or public opening date has been verified. The authority says only that the project is expected to become operational soon.
What is not yet confirmed
- The opening or handover date.
- The unit count — 16 per the balloting report against 32 per later reporting, possibly phase one against the total, but unresolved.
- Prices, availability and published leasing terms.
- Parking arrangements, opening hours and a public access plan.
- Details of the “Second Walk” phase, reported at excavation stage.
Facts on this page come from published reports and the official PCBDDA offering pages, rewritten here in PlottoSky’s own wording. Figures are dated October–November 2026; verify current details with PCBDDA before making any decision.